Harborview Commercial Tower
Structural Design
BIM lead — as-built modelling, coordination and full construction issue set.
Depot halls, pits and gantry steel modelled to LOD 350 with connection schedules.
Complete. Forty-one clashes resolved on screen; none reached site.
A rail operator extending a maintenance depot around live tracks — long-span halls, inspection pits, crane girders and a forest of services, all to be built without stopping a single timetable. My model was the single source of truth.
Starting from a point-cloud survey, I built the structural model and federated it with architecture and services for weekly clash reviews. Forty-one clashes were found and resolved on screen — gantry columns against cable trays, pit drainage against footings — before anyone mobilised. Clashes found on screen cost nothing; on a live railway they cost possessions you cannot buy back.
From the model I issued dimensioned general arrangements, sections, connection details and steel schedules under full revision control. The steelwork contractor told me it was the cleanest issue set they had fabricated from in years — and the depot entered service on programme.
Drowning in uncoordinated drawings? See my BIM and drafting service or send me your drawings for a drafting programme and fixed fee.
Tell me about your site and I’ll scope the engineering in one conversation.